At COOPS Switchgear, we are committed to ensuring that every product we deliver meets the highest standards of quality and performance. Our Factory Acceptance Testing (FAT) service is a crucial step in this process, allowing us to verify and validate that our electrical equipment and systems are fully operational and meet your specific requirements before they leave our facility.
Our state-of-the-art testing facility is equipped with advanced tools and technology, allowing us to perform a wide range of tests, including:
All the COOPS Switchgear & the subcontracted site services team are CSCS qualified and always carry a current valid card – a mandatory standard for site work around the UK
This well experienced team have encountered, and successfully dealt with, some of the most challenging of site installations when undertaking the offload, final positioning, re-connection, and commissioning of our LV switchboards.
We’re ready to discuss your next project. If you have any questions or if you’d just like to discuss your project, reach out to our team of experts today.
about our
Product quality and consistency is a fundamental principle within our organisation.
All our solutions are manufactured to the current and relevant British Standards, and as approved system builders
Having built your LV solution, the final and most vital stage of the process is the rigorous testing of the switchboard and components before they leave the factory to ensure you have complete confidence in the systems operational performance.